The City of Apple Valley 2023 Capital Improvement Program identifies potential street reconstruction and maintenance work. The scope of the project consists of the following:

  • Galaxie Avenue Trail Resurfacing (McAndrew Rd to 135th St W)
  • Cobblestone Lake Parkway Pedestrian and ADA Compliant Improvements
  • Annual Ring Route Concrete Repairs
  • Pavement replacement at 132nd St Ct W, Fordham Ct, 135th Ct W, and Flair Ct
  • Misc. paver patching throughout the City
  • Water Main Break Street Patching

A map of the proposed project area is attached (Figure 1). This project is tentatively scheduled for construction in 2023. 

 The project development tasks for the proposed improvements would involve the following scope of work. 

  • Conduct a topographical field survey to collect ground elevation, utility locations and surface features within the proposed work zone.
  • Conduct a geotechnical investigation and soil borings within the work zone.
  • Conduct any stakeholder meetings to discuss the project with businesses and residents impacted by construction.
  • Prepare plans, specifications, and a project cost estimate.
  • Review project plans and cost estimate with the City Council prior to bid process.


Contact Us

  1. Brandon S. Anderson, P.E.
    City Engineer
    Email (Not monitored 24 hrs.)

    7100 147th St. W.
    Apple Valley, MN  55124

    Ph: (952) 953-2400
    Fx: (952) 953-2515

    Hours


    Monday - Friday
    8:00 am - 4:30 pm

  1. Maps
  2. Notices
  3. Project Information